Eurus Energy Holds Opening Ceremony for the Eurus Tabito Wind Farm

  • Projects
2024.03.22

Eurus Energy held an opening ceremony for the Eurus Tabito Wind Farm on March 21, which was constructed by Eurus Tabito Wind Farm LLC, a group company of Eurus Energy Holdings, and started operation on November 15, 2023. Local government officials, community members and construction partners attended the ceremony to pray for the safe operation of the wind farm.

he Eurus Tabito Wind Farm consists of five wind turbines installed along a ridge line at an elevation of approximately 700 to 800 meters. Each wind turbine has a single unit output of 4.2 MW, which is one of the highest capacity onshore models in Japan. This is Eurus Energy Group’s second wind farm in Fukushima Prefecture.

Based on our corporate philosophy of “Helping to preserve the global environment by disseminating and expanding clean energy technologies” and our corporate vision of “Develop with local communities and maintain the trust of society”, Eurus Energy group will continue to work on further expansion of wind power generation and contribute to global environmental conservation and the creation of a sustainable society.

 

【Outline of the Project

Name of the project Eurus Tabito Wind Farm
Location Tabito Town, Iwaki City, Fukushima Prefecture
Capacity 18.83MW(4.2MW × 5units/ Vestas / Output control to 18.83MW)
EPC KAJIMA CORPORATION
Start of construction July, 2021
Start of operation November 15, 2023
Purchaser Tohoku Electric Power Network Co., Inc.