AsturiasⅡ(Alto de Abara)
Location | Asturias |
---|---|
Capacity |
6.000 MW (2.0MWx3/Gamesa)
|
Start date in operation | 2010-12 |
Location | Asturias |
---|---|
Capacity |
6.000 MW (2.0MWx3/Gamesa)
|
Start date in operation | 2010-12 |