Acquisition of Wind Projects in the Netherlands
Eurus Energy Group has acquired six operational wind farms (total output of 32.18 MW) and one wind farm project currently under development (21 MW) from YARD ENERGY group, a major wind energy developer in the Netherlands. Through these acquisitions, Eurus Energy Group’s wind power business in the Netherlands will grow toa total of 15 operational wind farms with a combined output of 106.48 MW, and two projects under development or construction with an additional output totaling 42 MW.
While 4,340 MW of wind power generation had been introduced into the Netherlands by the end of 2017, the national goal is to reach a cumulative total of 6,000 MW by 2023. Thus, the further expansion of the Dutch wind power generation market is anticipated. Eurus Energy Group plans to continue development of its wind power business in this business environment.
1. Outline of Projects in Operation
Name of the project | Location | Capacity (MW) | Wind Turbine Type |
---|---|---|---|
Windpark Coevorden | Drenthe | 5.88 | Vestas V90 2.0 MW |
Windpark Buren | Gelderland | 8 | Vestas V90 2.0 MW |
Windpark Duiven | Gelderland | 8 | Vestas V90 2.0 MW |
Windpark De Lier | South Holland | 2.3 | Enercon E70 2.3 MW |
Windpark Vlaardingen | South Holland | 6 | Vestas V90 3.0 MW |
Windpark Vlissingen | Zeeland | 2 | Enercon E70 2.3 MW |
Total Output | 32.18 |
2. Outline of the Project under Development
Name of the project | Windpark Deil |
---|---|
Location | West Betuwe Gelderland, the Netherlands |
Total output | 21 MW(4.2 MW × 5 units / Vestas V136-4.2) |
Electricity purchaser | Eneco Group |
Completion | 2020 |