Opening Ceremony Held for Eurus Kamikatsu-Kamiyama Wind Farm
~Shikoku Region’s Largest Wind Farm Commences Commercial Operation~
- Projects
The opening ceremony for Eurus Kamikatsu-Kamiyama Wind Farm, which Eurus Group has been constructing in Tokushima Prefecture, in the vicinity of Kamikatsu Town, Katsuura District to near Kamiyama Town, Myozai District, was held in Kamikatsu Town on August 10th. The ceremony was attended by approximately 90 local officials and construction participants, including Tokushima Prefecture Governor Kamon Iizumi, who prayed for the safe operation of the wind farm.
This wind farm consists of 15 Enercon wind turbines, each with an output of 2.3MW, installed along a ridgeline with an altitude of approximately 900 to 1,000m. With an installed capacity of 34.5 MW, it is the largest wind farm in Shikoku Region and is Eurus Energy Group’s second wind farm in Tokushima prefecture.
This wind farm has already been in commercial operation since July 10th this year, and is expected to supply electric power equivalent to the amount used by approximately 20,000 households, reducing CO2 emissions by approximately 31,000 tons per year.
All electricity generated will be sold to Shikoku Electric Power Company, Incorporated.
In Tokushima Prefecture, which is promoting its “Promotion Strategy for Renewable Energy Prefecture Tokushima,” Eurus Energy Group intends to fulfill our corporate philosophy goals of "Helping to Preserve the Global Environment by Disseminating and Expanding Clean Energy Technologies” and also developing with the local community to supply environmentally friendly energy.
【Outline of the Project】
Name of the project | Eurus Kamikatsu-Kamiyama Wind Farm |
Location | Tokushima Prefecture, from Kamikatsu Town in the Katsuura District to near Kamiyama Town in the Myozai District |
Total output | 34.5MW (2.3MW×15unites / Enercon) |
最新のPress Release/News
-
Release
2023.12.06
Sale of Non-FIT Non-Fossil Certificates with Tracking through Private Exchange
-
Release
2023.12.01
Eurus Tabito Wind Farm Starts Operation
-
Projects
2023.11.13
Opening Ceremony Held for the Battery Energy Storage System at the Eurus Tashirotai Wind Farm
-
Release
2023.11.01
Commencement of Demonstration Project of Eurus Energy’s First Battery Energy Storage System using Electric Vehicle Storage Batteries
~ Aiming to Stabilize Renewable Energy Power Supply and Demand~